Project Examples


Renewable energy
BE was appointed to produce an ecological impact assessment and mitigation plan for the site of a proposed hydroelectricity power station on the edge of the Snowdona National Park. This has required detailed assessment of upland habitats, scarce higher and lower plant surveys as well as an assessment of potential impacts upon salmonid fish.

 


Rochdale Kingsway
BE are the Project Ecologists on this long running development, one of the largest new build business parks in the north of England and sited in an ecologically sensitive area. Kingsway includes the phased construction of a distributor road network and new off slip from the adjacent M62, plus extensive business unit plots, SUDS drainage, and enhancements to an existing Site of Biological Interest. During this project we have directed extensive habitat creation, bat survey and mitigation, carried out mud snail translocation, water vole capture, a captive breeding programme and water vole re-introduction in nearby vacant habitat. We have been retained through phase one and two of this project and are completing the final phase of water vole mitigation, and habitat monitoring over the next two seasons.


YES South Yorkshire
Working for Tropus Project Management we produced a comprehensive protected species survey, mitigation and enhancement package for a proposed leisure complex on a large restored colliery site. Central to this package was the design of a significant new area of reed bed extending an existing location which regularly attracts wintering bittern.


RSA Sandwell Academy
One of a number of the Department for Education school upgrades we have been involved with, we are producing ecological baseline assessments including phase 1 habitat survey, amphibian assessments and bat surveys. This information is being fed into a BREEAM ecological enhancement package to deliver biodiversity gains and a stimulating educational environment.


Leeds Metropolitan University
Among the large number of BREEAM ecological assessments BE has carried out is the prestigious Rose Bowl building, currently under construction by HBG in central Leeds.


Port related facility
BE was appointed by a major UK port client to produce a wintering bird assessment and badger territorial analysis of land adjacent to a Special Protection Area (SPA). We also developed a water vole mitigation strategy as part of a comprehensive EIA for port related facilities.


Phone 0113 250 6101 Fax 0113 250 6944 Email info[insert @brooksecological.co.uk
2 High Street House, High Street, Yeadon, Leeds LS19 7PP